The traffic congestion is extreme by bcell

View this thread on steempeak.com
· @bcell ·
$0.07
The traffic congestion is extreme
The capitalist is facing severe traffic congestion. On Sunday after Sunday, there was heavy rainfall in Dhaka. In this, the lanes from the main road are swept into the water everywhere. On some roads, the waist water from the knee gets accumulated. After some two or three hours water level of some roads has been withdrawn, but in many places the water logging is created. In addition to rain and water logging, most of the roads were created due to unbearable traffic congestion.

Since 11am on Monday, the sky of the sky covered with black clouds. In mid-afternoon, the light of daylight shone in black darkness. Then began with the sound of Kanfha as well as heavy rain. This precipitation for about half an hour. In this, water from the main road to the lanyli is accumulated everywhere. Cadapani was created due to the looming city corporation and WASA on many roads. Besides, due to the narrowing of the roads, there is a lot of misery in the public transport.
The road from Kamlapur to Shahjahanpur gets submerged in water. Even at 5pm, there were hotspots in some places on the road. The roads were cut off on one side of the road. On the other side, the cement pipe row is huge. In that road, the long traffic congestion was created. Some CNG and private operators are seen to be stuck after going through the water.

Hooda water accumulates in Arambagh CNG Pump Station area. When a car gets through the water, the river rises in the water. Water in the Oligali in Basabo Ahmadbagh area has got accreted. Residents of the area said that the huts were submerged in those roads until evening.
Hooter water is accumulating when the road in front of Nur Nagar Jami Mosque adjacent to Hatirjhil rains. There is no way to move from the Biam auditorium to Hatirjheel. Masjid committee member Md. Rawshan Ali told Naydiganta that there are some houses on the road, Baiyam school-college and auditorium, mosque and a madrasa. Many important people walk in the BIAM auditorium, including the Minister-Empower. The road next to Hatirjheel But this road is not being watched much. The Hatirjheel Development Authority does not have to suffer the suffering of the local residents.

Like the usual rain on Monday, the people of Mirpur have to suffer unbearable sufferings. Especially due to the construction of the Metro road, water logging is created on all the roads related to it. Alongside this, due to the narrow road the long traffic congestion is created. People traveling for public transport can take 3-4 hours to reach Agargaon from Mirpur-10. On the rainy season, the waves of the Padma are rising in the rainy season. On Monday, the sidewalks surrounding Kalshi road also got submerged in water. Pedestrian traffic also became difficult. Besides, the road is now in the vicinity of the shops after the road has been raised slightly. Local residents complained that due to the acquisition of Kalishi canal, the water was blocked due to the closure of the water.
A bus driver named Shakil Ahmed said, "Arrive at Farmgate" at 12 noon. But Bangabandhu took three and a half hours to reach the International Conference Center. Water and water on Sherawapara, Kazipara road. There is no way to get water from the road. Due to the movement of vehicles, there are huge waves in the water.
👍  , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
properties (23)
post_id46,328,091
authorbcell
permlinkthe-traffic-congestion-is-extreme-7859b07845bb8
categorytraffic
json_metadata"{"format": "markdown+html", "app": "esteem/1.6.0", "community": "esteem", "tags": ["traffic", "esteem"]}"
created2018-05-01 07:53:15
last_update2018-05-01 07:53:15
depth0
children0
net_rshares13,758,851,445
last_payout2018-05-08 07:53:15
cashout_time1969-12-31 23:59:59
total_payout_value0.068 SBD
curator_payout_value0.003 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length3,289
author_reputation220,461,792,063
root_title"The traffic congestion is extreme"
beneficiaries
0.
weight1,000
accountesteemapp
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (64)