2 days later they forgot they scheduled our job. by tecnosgirl

View this thread on steempeak.com
· @tecnosgirl ·
$3.47
2 days later they forgot they scheduled our job.
# Seriously you forgot you had a job today

I was wondering where the guy that is suppose to be fixing what the finishing crew left unfinished or did wrong. We talked earlier in the week and he told me he would be here this morning. Since it is going on noon I decided to call him to find out when he will be here. As later on I have to take my daughter back to campus. He said and I quote " Oh shit I forgot I had a job today!" 

# Wants to come now at 5 pm

It gets dark here around 5 pm and we have no electricity hooked up to the house yet. He knows this and I am wondering how he is going to work in the dark. I have a funny feeling that though I thought my house would be done today except waiting for the state to issue the permit to the city so we can get our electric hooked  up that it won't be. I am starting to think if we want it fixed right we are going to have to do it ourselves. We have the skills but since we did a modular build  and was spending so much we figured why not spend the additional $5000 and have them finished it off to. 

# I can't find what file I put the wall damage photos that the first guys that came out did to the wall
But here is the shotty job they did finishing the facial board outside, there are gaps that will allow Bees to get in and make hives, it isn't done correctly and I am not going to end up having to deal with a honey comb wall. This has to get fixed. 

![20171214_140022.jpg](https://steemitimages.com/DQmRU6gw4vGDzWcT5xJJJY4ZgA8WbYU7tGN7hYoP1gjwKnc/20171214_140022.jpg) *West side of the house*

![20171214_140119.jpg](https://steemitimages.com/DQmUVbAUyQqcAJAEcwenj2ou1tagNzgJr8FuBdMd3UH9DDZ/20171214_140119.jpg) *East side of the house*

# The list of things that needs to be fixed 
Besides the outside facial boards we have two walls that the first guys they sent out damaged. All the inside doors need to be adjust they either won't shut at all or if they do they won't latch and come open. The Back door needs to be adjusted you can see daylight when it shuts and it doesn't line up correctly so the deadbolt doesn't lock. The Front door is the only door shutting properly and locking right.  The connecting pipe to connect the halves heating system needs to be installed and connect. This is what they were paid for and what hasn't been done correctly. I refuse to allow them to sign off on a job that isn't done. 

![untitled.png](https://steemitimages.com/DQmVBgJr2k8xdeRdwfkLng3adEkfZpLTnXs2eon5v6tAAN5/untitled.png)
👍  , , , , , , , , , , ,
properties (23)
post_id23,988,692
authortecnosgirl
permlink2-days-later-they-forgot-they-scheduled-our-job
categoryconstruction
json_metadata"{"app": "steemit/0.1", "format": "markdown", "image": ["https://steemitimages.com/DQmRU6gw4vGDzWcT5xJJJY4ZgA8WbYU7tGN7hYoP1gjwKnc/20171214_140022.jpg"], "tags": ["construction", "building", "life", "blog", "family"]}"
created2018-01-06 16:49:39
last_update2018-01-06 16:49:39
depth0
children9
net_rshares357,683,561,216
last_payout2018-01-13 16:49:39
cashout_time1969-12-31 23:59:59
total_payout_value2.791 SBD
curator_payout_value0.678 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length2,484
author_reputation42,657,951,880,159
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (12)
@charisma777 ·
$0.08
How does someone forget about a job! He must have had one heck of a New Year's!!! I know you are so ready to be in your new home at this point, that is very frustrating...I am curious how he plans on doing it in the dark also! Especially in this cold!
👍  
properties (23)
post_id23,991,736
authorcharisma777
permlinkre-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180106t170717413z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-06 17:07:21
last_update2018-01-06 17:07:21
depth1
children4
net_rshares8,830,354,168
last_payout2018-01-13 17:07:21
cashout_time1969-12-31 23:59:59
total_payout_value0.077 SBD
curator_payout_value0.005 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length251
author_reputation2,928,644,564,625
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (1)
@tecnosgirl ·
I talked to him on the 4th that is what is truly messed up.  In 2 days he forgot he was suppose to come. I am SMH
properties (22)
post_id23,992,500
authortecnosgirl
permlinkre-charisma777-re-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180106t171144614z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-06 17:11:45
last_update2018-01-06 17:11:45
depth2
children3
net_rshares0
last_payout2018-01-13 17:11:45
cashout_time1969-12-31 23:59:59
total_payout_value0.000 SBD
curator_payout_value0.000 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length113
author_reputation42,657,951,880,159
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
@charisma777 ·
$0.09
Well, Friday was one of those days, and no offense to construction workers but you know they like to go throw a few back with the ladies on Friday nights LOL, if you are in construction and you read these comments, I don't mean you...:)
👍  
properties (23)
post_id23,994,447
authorcharisma777
permlinkre-tecnosgirl-re-charisma777-re-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180106t172312497z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-06 17:23:15
last_update2018-01-06 17:23:15
depth3
children2
net_rshares9,368,036,675
last_payout2018-01-13 17:23:15
cashout_time1969-12-31 23:59:59
total_payout_value0.067 SBD
curator_payout_value0.020 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length236
author_reputation2,928,644,564,625
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (1)
@aunt-deb ·
$0.09
Even if he forgot, he should have been out there immediately upon hanging up the call. Sigh....
👍  
properties (23)
post_id24,004,152
authoraunt-deb
permlinkre-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180106t182302950z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-06 18:23:03
last_update2018-01-06 18:23:03
depth1
children1
net_rshares9,368,036,675
last_payout2018-01-13 18:23:03
cashout_time1969-12-31 23:59:59
total_payout_value0.067 SBD
curator_payout_value0.020 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length95
author_reputation31,948,056,546,743
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (1)
@tecnosgirl ·
Ikr that is why I vent posted
👍  
properties (23)
post_id24,010,580
authortecnosgirl
permlinkre-aunt-deb-re-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180106t190211746z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-06 19:02:18
last_update2018-01-06 19:02:18
depth2
children0
net_rshares1,080,576,278
last_payout2018-01-13 19:02:18
cashout_time1969-12-31 23:59:59
total_payout_value0.000 SBD
curator_payout_value0.000 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length29
author_reputation42,657,951,880,159
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
author_curate_reward""
vote details (1)
@winstonalden ·
Why is dealing with construction workers ALWAYS like this?

We paid a guy to install a new sliding door in a shed. He installed it backwards! We had to go over the instructions with him to work out how to switch the track around to have it open on the right instead of the left. Then he wanted to charge extra labor for pulling it out and putting it back in again.

Every damn time.
properties (22)
post_id24,882,564
authorwinstonalden
permlinkre-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180110t222934199z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-10 22:30:27
last_update2018-01-10 22:30:27
depth1
children1
net_rshares0
last_payout2018-01-17 22:30:27
cashout_time1969-12-31 23:59:59
total_payout_value0.000 SBD
curator_payout_value0.000 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length382
author_reputation22,967,361,763,386
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000
@tecnosgirl ·
I don't know but I do have to say with each day that goes by I am more and more disappointed in everything. I don't know if you most recent posts about the job but now we have ice on our electrical panel inside the house and ice on the wall. I also have posted more photos of the damages.
properties (22)
post_id24,890,499
authortecnosgirl
permlinkre-winstonalden-re-tecnosgirl-2-days-later-they-forgot-they-scheduled-our-job-20180110t232734064z
categoryconstruction
json_metadata"{"app": "steemit/0.1", "tags": ["construction"]}"
created2018-01-10 23:27:36
last_update2018-01-10 23:27:36
depth2
children0
net_rshares0
last_payout2018-01-17 23:27:36
cashout_time1969-12-31 23:59:59
total_payout_value0.000 SBD
curator_payout_value0.000 SBD
pending_payout_value0.000 SBD
promoted0.000 SBD
body_length288
author_reputation42,657,951,880,159
root_title"2 days later they forgot they scheduled our job."
beneficiaries[]
max_accepted_payout1,000,000.000 SBD
percent_steem_dollars10,000